BARBAMARCO LAGOON PROJECT

FIELD WORK

n

 Barbamarco Lagoon, Italy

This page will contain photos, results and details of the various field campaigns as they are performed.

    Data report


April 2002                 IPROS - 48 hr intensive field campaign #1
                                                    - Temperature, Conductivity

 Map 1: IPROS Field Station Locations


Date Results Description
Day 114 114_0_1
curt_114
1. Barbamarco sheet : depth 0-1m
2. Barbarmarco curtain : north to south along main 
    channel


September 2002       IPROS - 48 hr intensive field campaign #2 (see Map 1 for locations)
                                            - Temperature, Conductivity, Salinity
 
 

Date File Description
Day 253 253_0_1 
curt_253
1. Barbamarco sheet : depth 0-1m
2. Barbarmarco curtain : north to south along main 
    channel


September 2002       CWR - 1 week intensive field campaign
                                                - Conductivity, Temperature, Fluorescence, Turbidity, Salinity, pH
Processing Notes
NB: A sheet is a plane view ie horizontal transect and a curtain is a vertical transect
 

Date File Description
Day 252 curt1_pm
curt2_pm
1. Adriatic curtain (PM): E-W Adriatic-Po
2. Adriatic curtain (PM): E-W Adriatic-Bocca Sud
Day 253 am
pm
1. Adriatic sheet (AM): depth 0-1m
2. Adriatic sheet (PM): depth 0-1m
Day 254 curt1_pm 1. Barbamarco curtain (PM): E-W Bocca Sud-Lagoon
Day 255 curt5_am
curt1_pm
1. Barbamarco curtain (AM): S-N Along Lagoon
2. Barbamarco curtain (PM): N-S Along Lagoon
Day 256 am
curt1_am
1. Barbamraco sheet (AM): depth 0-1m
2. Barbamarco curtain (AM): W-E Lagoon-Bocca Sud
Day 257 am
curt1_pm
1. Adriatic sheet (AM): depth 1-2m
2. Adriatic curtain (PM): E-W Adriatic-Po
Day 258
pm
1. Adriatic sheet (PM): depth 0-1m
                                                                                                                                                                                                                                                    

September 2002       IPROS - 48 hr intensive field campaign #3 (see Map 1 for locations)
                                            - Temperature, Conductivity
 

Date Results Description
 
Forthcoming
 

To download matlab scripts used to process data, click here

Top

                                                                                                                                                                                                          Updated: 4th March 2003